Refine your search:     
Report No.
 - 
Search Results: Records 1-10 displayed on this page of 10
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Irradiation tests report of the 34th cycle in "JOYO"

*

JNC TN9440 2000-005, 164 Pages, 2000/06

JNC-TN9440-2000-005.pdf:4.51MB

This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 34th cycle, and estimates the 35th cycle irradiation condition. Irradiation tests in the 34th cycle are as follows: (1)C-type irradiation rig (C4F) (a)High burnup perfomance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (2)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (3)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (4)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (5)Structure Materials Irradiation Rigs (SMIR) (a)Decision of material design base standard of structure materials for prototype reactor and large reactor (6)Upper core structure irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect (7)SurVeillance un-instrument Irradiation Rig (SVIR) (a)Confirmation of surveillance irradiation condition for "JOYO" (b)Material irradiation tests (in collaboration with universities) The maximum burnup driver assembly "PFD537" reached 68,500MWd/t(pin average).

JAEA Reports

Irradiation tests report of the 33rd cycle in "JOYO"

*

JNC TN9440 2000-002, 157 Pages, 2000/02

JNC-TN9440-2000-002.pdf:5.44MB

This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 33rd cycle, and estimates the 34th cycle irradiation condition. Irradiation tests in the 33rd cycle are as follows: (1)B-type irradiation rig (B9) (a)High burn up performance tests of "MONJU" fuel pins, advanced austenitic steel cladding fuel pins, large diameter fuel pins, ferrite steel cladding fuel pins and large diameter annular pellet fuel pins (b)Mixed carbide and nitride fuel pins irradiation tests (in collaboration with JAERI) (2)C-type irradiation rig (C4F) (a)High burn up performance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (3)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (4)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (5)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (6)Core Materials Irradiation Rig (CMIR-5-1) (a)Core materials irradiation tests (7)Structure Materials Irradiation Rigs(SMIR) (a)Material irradiation tests (in collaboration with universities) (b)Surveillance back up tests for "MONJU" (8)Upper core structure Irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect. The maximum burnup driver assembly "PFD516" reached 64,300MWd/t (pin average).

Journal Articles

Motor generator with flywheel effect

Miyachi, Kengo

Purazuma, Kaku Yugo Gakkai-Shi, 73(4), p.427 - 433, 1997/00

no abstracts in English

JAEA Reports

Operation and maintenance experience on the fuel handling systems and storage facilities of "MONJU", 1

; ; Yamada, Takeshi; ; ; ; Kaito, Yasuaki; ; Kotaka, Yoshinori; ; et al.

PNC TN2410 96-005, 339 Pages, 1996/03

PNC-TN2410-96-005.pdf:14.53MB

Construction of the 'Monju' fuel handling systems was completed in April, 1992. From March 1991 to August 1992, pre-commissioning tests were carried out. In December 1992, all the systems of Monju were transfered to PNC, and commissioning tests and reactor physics tests, were started. For the first time, during these physics tests, the fuel handling systems were operated for one of the commissioning tests 'Loading to Criticality', without significant problems. 168 fuel sub-assemblies were loaded into the core and the first criticality was achieved on 5th April 1994. The fuel handling systems continued in operation for the 'Loading to Full Size of the Core', power distribution test and for cleaning discharged dummy sub-assemblies. To keep these fuel handling systems working somothly and satisfactorily annual maintenance has been carried out since 1992. This paper describes the operation and maintenance experience of fuel handling systems after the pre-commissioning tests and future study items for system reliability improvement.

JAEA Reports

None

Power Reactor and Nuclear Fuel Development Corporation

PNC TN9360 95-002, 98 Pages, 1995/11

PNC-TN9360-95-002.pdf:4.61MB

no abstracts in English

JAEA Reports

None

Power Reactor and Nuclear Fuel Development Corporation

PNC TN9360 95-001, 104 Pages, 1995/11

PNC-TN9360-95-001.pdf:4.23MB

no abstracts in English

JAEA Reports

None

Power Reactor and Nuclear Fuel Development Corporation

PNC TN9360 94-002, 100 Pages, 1994/02

PNC-TN9360-94-002.pdf:4.75MB

no abstracts in English

JAEA Reports

None

Power Reactor and Nuclear Fuel Development Corporation

PNC TN9360 94-001, 95 Pages, 1994/02

PNC-TN9360-94-001.pdf:4.57MB

no abstracts in English

JAEA Reports

Operation experience report of experimental fast reactor JOYO; Operation expelience of primary main and auxiliary cooling systems of JOYO

Karube, Koji; ; ; ; Kawai, Masashi;

PNC TN9440 93-012, 83 Pages, 1993/04

PNC-TN9440-93-012.pdf:5.27MB

This report describes the operating experience of the primary main cooling system from January 1982 to March 1992, and of the primary auxiliary cooling system from october 1986 to March 1992. 0ut lines of the operating experience ale followings; There have been no serious troubles in this period. (1)The main system; Operation time of the circulation pumps are about 67675 hours. Accumulated operation time of the pumps are about 105970 hours. The pumps has been started 212 times. (2)The auxiliary system; Operation time of the circulation pump (EMP) is about 4767 hours. Accumulated operation time of the pump is about 8667 hours. The pump has been automatically started 31 times with the scheduled test.

JAEA Reports

None

Terano, Toshihiro; ; Terunuma, Seiichi

PNC TN9410 91-325, 71 Pages, 1991/10

PNC-TN9410-91-325.pdf:1.74MB

None

10 (Records 1-10 displayed on this page)
  • 1